On December 26, the first phase of the Zhuzhou Autonomous Rail Rapid Transit was successfully tested, it is a railless guided bus system for urban passenger transport. Developed by CRRC Zhuzhou Institute Co Ltd.

The total length of the first phase of Zhuzhou Autonomous Rail Rapid Transit is 11.5 kilometers, with 15 stations, with an average distance of 680 meters, and 9 trains. This trial run is the Hexi section of Phase I, with a length of 7.7 kilometers.

This time, the no-load test run was conducted to verify the performance of the inner semi-flexible road surface and test the matching of the train with the station and civil engineering.

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *